Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 18 results ...

Brosque, C, Skeie, G and Fischer, M (2021) Comparative Analysis of Manual and Robotic Concrete Drilling for Installation Hangers. Journal of Construction Engineering and Management, 147(03).

BuHamdan, S, Duncheva, T and Alwisy, A (2021) Developing a BIM and Simulation-Based Hazard Assessment and Visualization Framework for CLT Construction Design. Journal of Construction Engineering and Management, 147(03).

Cherkos, F D and Jha, K N (2021) Drivers of Road Sector Public-Private Partnership Adoption in New and Inexperienced Markets. Journal of Construction Engineering and Management, 147(03).

Dias Barkokebas, R and Li, X (2021) Use of Virtual Reality to Assess the Ergonomic Risk of Industrialized Construction Tasks. Journal of Construction Engineering and Management, 147(03).

  • Type: Journal Article
  • Keywords: Virtual reality; Ergonomic risk assessment; Rapid upper limb assessment; Rapid entire body assessment; Industrialized construction;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0001997
  • Abstract:
    Workers in industrialized construction are often exposed to physical demands (e.g., repetitive motion and awkward body posture) associated with the risks of work-related musculoskeletal disorders, despite the utilization of automated equipment. To reduce exposure to these risks, an investigation of workstation design is needed. This paper proposes a virtual reality (VR)-based ergonomic assessment method that identifies ergonomic risk ratings proactively in the initial phases of workstation design, thus reducing the need for physical mock-ups and lessening the cost and time required to develop and implement an improved workstation design. This method was demonstrated in an operational task through an experiment conducted with 13 participants. Compared with the physical mock-up, the designed VR application achieved an accuracy of approximately 86% and 80%, respectively, in Rapid Upper Limb Assessment and Rapid Entire Body Assessment to assess risk. Moreover, a questionnaire was developed to obtain feedback from participants on their perceptions toward the designed VR application, which further supported the success of using the proposed VR-based ergonomic assessment method.

El Sayed, A Y, Darwish, M and Nassar, K (2021) Design and Constructability of Novel Extendable Arched Steel Truss Falsework. Journal of Construction Engineering and Management, 147(03).

Hamledari, H, Sajedi, S, McCabe, B and Fischer, M (2021) Automation of Inspection Mission Planning Using 4D BIMs and in Support of Unmanned Aerial Vehicle–Based Data Collection. Journal of Construction Engineering and Management, 147(03).

Kar, S and Jha, K N (2021) Investigation into Lead Time of Construction Materials and Influencing Factors. Journal of Construction Engineering and Management, 147(03).

Katsuragawa, C M, Lucko, G, Isaac, S and Su, Y (2021) Fuzzy Linear and Repetitive Scheduling for Construction Projects. Journal of Construction Engineering and Management, 147(03).

Kim, K and Cho, Y K (2021) Automatic Recognition of Workers’ Motions in Highway Construction by Using Motion Sensors and Long Short-Term Memory Networks. Journal of Construction Engineering and Management, 147(03).

Liu, Y, Jarvamardi, A, Zhang, Y, Liu, M, Hsiang, S M, Yang, S, Yu, X and Jiang, Z (2021) Comparative Study on Perception of Causes for Construction Task Delay in China and the United States. Journal of Construction Engineering and Management, 147(03).

Ma, G, Jia, J, Ding, J, Wu, M and Wang, D (2021) Examining the Impact of Social Media Use on Project Management Performance: Evidence from Construction Projects in China. Journal of Construction Engineering and Management, 147(03).

Mahdavian, A, Shojaei, A, Salem, M, Yuan, J S and Oloufa, A A (2021) Data-Driven Predictive Modeling of Highway Construction Cost Items. Journal of Construction Engineering and Management, 147(03).

O’Connor, J T, Shrestha, B K, Winkler, M and Ouk Choi, J (2021) Relationship between Commissioning and Start-Up Success Factors Achievement and Performance in Capital Projects. Journal of Construction Engineering and Management, 147(03).

Raymond, A J, Kendall, A, DeJong, J T, Kavazanjian, E, Woolley, M A and Martin, K K (2021) Life Cycle Sustainability Assessment of Fugitive Dust Control Methods. Journal of Construction Engineering and Management, 147(03).

Shirowzhan, S, Sepasgozar, S M E and Trinder, J (2021) Developing Metrics for Quantifying Buildings’ 3D Compactness and Visualizing Point Cloud Data on a Web-Based App and Dashboard. Journal of Construction Engineering and Management, 147(03).

Yoon, S, Weidner, T and Hastak, M (2021) Total-Package-Prioritization Mitigation Strategy for Deferred Maintenance of a Campus-Sized Institution. Journal of Construction Engineering and Management, 147(03).

Zhang, S, Jiang, P, Zhang, Z and Wang, C (2021) WebGIS-Based Collaborative Construction Quality Control of RCC Gravity Dam Using Sensing Devices. Journal of Construction Engineering and Management, 147(03).

Zuniga-Garcia, N, Machemehl, R B, Khwaja, N A, Pruner, K D and Fu, M (2021) Estimation of Road User Costs for Work Zones in Data-Limited or Time-Constrained Environments. Journal of Construction Engineering and Management, 147(03).